Aufbau und Abbau

For?
We want to make the IN*VISION beautiful and as suitable as possible for different needs. To do this, we need an incredible amount of help in construction and dismantling!!!
What are the tasks?
We have to set up workshop and sleeping tents, decorate the square and the houses, build things out of pallets and wood, set up awnings, paint and hang signs/banners and much more. And at the end of the IN*VISION everything has to be dismantled, sorted, cleaned and put away.
For the construction and dismantling we will take care of full catering for all the people who will be there. This will allow you to enjoy the beautiful Quecke grounds and time with lots of great people for even longer. Much of the work is physically demanding work.
Set up is 2 shifts and tear down is one shift. These are each 3 days long. You really need to be on the site for the full 3 days for one shift, or be in the car with others to transport our materials to and from the site.
Requirements?
During the preparation weekend you will learn more about the tasks of this team in a short online session.
Positioning: Open.